Anbumani seeks demolition of retaining wall and walkway being built in Pallikaranai Marsh
The PMK president says these structures had obstructed rainwater flow and caused flooding at Pallikaranai and Jalladianpet, where the stagnant rainwater had to be pumped into the marsh
· 10/22/2026, 11:04:47 AM· 2 min read
The PMK president says these structures had obstructed rainwater flow and caused flooding at Pallikaranai and Jalladianpet, where the stagnant rainwater had to be pumped into the marsh
Read original story →Related stories
breaking
CM D.K. Shivakumar to meet with sugarcane farmers in Suvarna Soudha on October 26

breaking
300 trucks stranded at Assam-Bengal border; Andhra lorry owners seek Centre’s intervention

breaking
Tamil Nadu government releases list of public holidays for 2027

breaking