Breaking

Asutosh Biswas assumes charge as Head of Project at NTPC Kayamkulam

He has over three decades of experience in the power sector, and was previously Chief General Manager (Operation and Maintenance) at NTPC Unchahar in Uttar Pradesh

· 9/8/2026, 1:26:55 PM· 2 min read
Asutosh Biswas assumes charge as Head of Project at NTPC Kayamkulam
He has over three decades of experience in the power sector, and was previously Chief General Manager (Operation and Maintenance) at NTPC Unchahar in Uttar Pradesh
Read original story

Related stories