Becoming fully renewable energy-based by 2040 may be challenging for Keralam: study
Keralam will need at least 27 gigawatts of renewable capacity addition to meet the 2040 electricity demand purely from renewables, hydro and nuclear without any thermal power support, according to a study by WRI India
· 9/30/2026, 10:52:00 AM· 2 min read

Keralam will need at least 27 gigawatts of renewable capacity addition to meet the 2040 electricity demand purely from renewables, hydro and nuclear without any thermal power support, according to a study by WRI India
Read original story →Related stories

breaking
Retired temple EOs in Tamil Nadu allege delay in terminal benefits over pending audit objections
breaking
Gutkha, soyabean oil worth ₹4.78 crore seized in Maharashtra FDA operations
breaking
Withdraw cut in crude palm oil import duty, Rythu Sangham urges Centre

breaking