Breaking

Eravipuram railway station development works to finish by January 2027

The master plan for the station includes upgrading both platform 1 and platform 2 to a standard height of 84 cm, alongside extending their length on either side

· 8/21/2026, 12:58:05 PM· 2 min read
The master plan for the station includes upgrading both platform 1 and platform 2 to a standard height of 84 cm, alongside extending their length on either side
Read original story

Related stories