Isarda dam project work being expedited to meet water supply targets
The project targets supplying water to urban areas through the main pipeline by next month, while the connections will be added in phases in the rural areas where the required water infrastructure has been completed
· 10/17/2026, 1:34:26 AM· 2 min read
The project targets supplying water to urban areas through the main pipeline by next month, while the connections will be added in phases in the rural areas where the required water infrastructure has been completed
Read original story →Related stories

politics
SP decides not a field a third candidate for the Rajya Sabha election
politics
Keralam Lok Ayuktha seeks files of helicopter rental deal and travel of Chief Minister V.D. Satheesan
politics
ED provisionally attaches ₹136.44-crore assets in illegal coal mining case
politics