Non-monsoon timetable will be effective on Konkan Railway network from October 21
During the monsoon timetable, which came into effect on June 15, trains on the Konkan Railway route operated at reduced speeds as a precaution against rain-related mishaps
· 10/18/2026, 10:55:59 PM· 2 min read

During the monsoon timetable, which came into effect on June 15, trains on the Konkan Railway route operated at reduced speeds as a precaution against rain-related mishaps
Read original story →Related stories

breaking
Burnham says youth employment and training crisis is a 'moral failure'
breaking
Two held for sexual exploitation of minor of minor in Kovalam spa

breaking
Nothing can save CEC; SIR must be suspended forthwith: Congress

breaking