Upper Bhadra Project: Trial run to Chitradurga branch canal begins
Three TMC of water is being released as part of the trial run, launched at the project’s intake point on the Bhadra reservoir
· 9/6/2026, 10:30:31 AM· 2 min read
Three TMC of water is being released as part of the trial run, launched at the project’s intake point on the Bhadra reservoir
Read original story →
