With CM Vijay opening the Mettur dam, focus turns to longevity of water release
On Tuesday (September 1, 2026), the water level stood at 91.56 ft with the storage being about 54.45 thousand million cubic feet (tmc ft). The dam’s full level is 120 ft and the capacity is 93.47 tmc ft
· 9/1/2026, 5:52:44 AM· 2 min read
On Tuesday (September 1, 2026), the water level stood at 91.56 ft with the storage being about 54.45 thousand million cubic feet (tmc ft). The dam’s full level is 120 ft and the capacity is 93.47 tmc ft
Read original story →Related stories

breaking
Theft from Madras Regiment armoury triggers high alert, online classes advised for cantonment schools

breaking
Electoral scenario will change in 2029, NEET abolition will be first voice in Parliament: T.N. Minister Aadhav Arjuna
breaking
Madras High Court sets aside conviction, imprisonment imposed on BJP leader H. Raja in two criminal cases
breaking